170918 Memorial Park MIN=
ATTENDANCE
Members Present: Mel Getty: Co-Chair, Mike Cerna: Co-Chair, Peter Luciani (Dog Park), Ken
Patterson (Rotary), Scott Vitias (Ball), Rosemary Dean (Fair), Derek Partlo (Ball Users), Jane
Ann McLean (Outdoor rink/Ball), Terry Smith (Pumptrack), Rick Cox: Staff, Margaret Puhr:
Secretary (Event Organizers)
Guests: Chrissy Rosehart (Councillor), Tracy Green (Fair)
MEMBERS ABSENT/REGRETS
Shane Curtis, Lance McKenzie, Dave Martin, Cedric Tomico, Paul DeCloet, Sue Saelens
1. Call to Order
The meeting was called to order at 5:30pm, by Co-chair Mel Getty.
2. Adoption of Agenda
Moved By: Ken Patterson Seconded By: Rosemary Dean
Resolution #1_
THAT the agenda as prepared for the Memorial Park Revitalization Committee meeting of
September 18, 2017, be adopted. Carried.
3. Disclosures of Pecuniary Interest and the General Nature Thereof
There were no disclosures of pecuniary interest declared.
4. Adoption of Minutes of Previous Meeting
4.1. Minutes of the Meeting of July 24, 2017
Moved By: Terry Smith Seconded By: Mike Cerna
Resolution #2_
The Corporation of the Town of Tillsonburg
Memorial Park Revitalization Committee
September 18, 2017
5:30pm
Marwood Lounge
45 Hardy Ave.
MINUTES
Memorial Park Revitalization Committee Meeting Minutes, May 15, 2017 - 2 -
THAT the Minutes of the Memorial Park Revitalization Committee Meeting of July 24,
2017 be approved as amended. Carried.
5. General Business & Reports
5.1. Staff update: Celebration Plaza – the turf maintenance is being done by the contractor,
in terms of structure a gravel ramp will be added at the back of the bandshell.
Otherwise, the work is wrapped up for the year.
An alternate site map was prepared showing the diamond to stay where it is. The cost is
unknown, but likely to be less than rebuilding/repositioning of the diamond. If the
diamond stays in current location, there will be some loss of event/park space, new
dugouts, backstop and screen will be needed, as well as leveling of infield and outfield
surface.
5.2. Approval of Master Plan:
Moved By: Jane Ann McLean Seconded By: Pete Luciani
THAT the Memorial Park Revitalization Project Subcommittee endorses the attached
updated coloured plan layout B and Conceptual Master Plan review summary;
AND THAT the plan layout B and review summary be consolidated as the Master Plan for
Memorial Park and referred to the Parks and Recreation Advisory Committee for
confirmation and to Council for confirmation and implementation. Carried.
5.3. Rotary Club: started fixing the memorial tree stones and put in mulch, cleared brush,
raked playground. Another 18 trees/stones to be fixed on October 1 weekend. Had a
positive response from residents adjacent to the park and hope they will join on October
1. The Rotary grant has been approved and the project must be in place by June 30,
2018 for the grant to apply. Lots of positive feedback.
5.4. Fair Board: still waiting for midway arrangements to set next year dates. Considering
shortening the fair to a 3 day event.
5.5. Pumptrack: the park is busy and getting more use. Signage is up – what is the final
decision on the signs? The ones that were put up are not the correct ones and are
pixelated, need to stick to what was decided. Sand still needs cleaning up on halfpipe,
there are volunteers who will do that.
Memorial Park Revitalization Committee Meeting Minutes, May 15, 2017 - 3 -
5.6. Lions Club: absent, Terry Smith advised that the club received quotes for the
playground and they were much too expensive, the club is now considering another
project, perhaps some decorative items.
5.7. Outdoor Rink: NHL gala event promoted the project and it was well received. The
committee is starting the fundraising and will be putting up a thermometer to show
monies raised to the community. Hoping to break ground this time next year.
5.8. Dog Park: the committee is meeting tomorrow. The quotes have been received and
fence project awarded with money left over in the budget. Fence installation to start on
October 17. The committee will reach out to the community to expand the group to work
on implementing the dog park. The committee also agreed unanimously to name Dave
Johnson Dog Park, the town naming committee is processing it.
5.9. Ball Diamond repositioning: per discussion on Master Plan.
6. Round Table
- Further fundraising for the dog park will be passed on to the expanded committee.
7. Next Meeting
The next meeting of the Memorial Park Revitalization Committee will be on Monday October
16, 2017 at 5:30pm.
8. Adjournment
Moved By: Rosemary Dean Seconded By: Jane Ann McLean
Resolution #4
THAT the Memorial Park Revitalization Committee Meeting of September 18, 2017 be
adjourned at 7:15pm. Carried.