Loading...
220118 Boundary Adjustment Committee AgendaPage 1 of 2 The Corporation of the Town of Tillsonburg Boundary Adjustment Advisory Committee January 18, 20222 7:30 a.m. Electronic AGENDA 1.Call to Order 2.Adoption of Agenda Proposed Resolution #1 Moved by: Seconded by: THAT the Agenda as prepared for the Boundary Adjustment Advisory Committee meeting of January 18, 2022, be adopted. 3.Minutes of the Previous Meeting Proposed Resolution #2 Moved by: Seconded by: THAT the Minutes as prepared for the Boundary Adjustment Advisory Committee meeting on November 16, 2021, be adopted. 4.Disclosures of Pecuniary Interest and the General Nature Thereof 5.Presentations $77$&+(' Presentation from Eric Gilbert on the Tillsonburg Residential Land Supply Update Briefing Note 5.5.11 (ATTACHED) 55.2.2 Presentation from Eric Gilbert on the Settlement Expansion Process Briefing Memo (ATTACHED)(2) Page 2 of 2 February 15, 2022 at 7:30 a.m. 10.Adjournment Proposed Resolution #3 Moved by: Seconded by: THAT the January 18, 2022 Boundary Adjustment Advisory Committee meeting be adjourned at _____ a.m. 8.Round Table 9.Next Meeting Closed Session Proposed Resolution #3 Moved by: Seconded by: THAT the Boundary Adjustment Advisory Committee move into closed session to discuss a proptery owners request. 7 7 . General Business and Reports6. Page 1 of 3 The Corporation of the Town of Tillsonburg Boundary Adjustment Advisory Committee November 16, 2021 7:30 a.m. Electronic MINUTES Present: Andrew Burns, Dave Beres (Chair), Cedric Tomico, Jesse Goossens, Samantha Hamilton Staff present: Kyle Pratt, CAO Kennedy Atkinson, Acting Executive Assistant Cephas Panschow, Development Commissioner Eric Gilbert, Senior Planner for Oxford County 1.Call to Order The meeting was called to order at 7:32 a.m. 2.Adoption of Agenda Resolution #1 Moved by: Cedric Tomico Seconded by: Jesse Goossens THAT the Agenda as prepared for the Boundary Adjustment Advisory Committee meeting of November 16, 2021, be adopted. Carried 3.Minutes of the Previous Meeting Resolution #2 Page 2 of 3 Moved by: Cedric Tomico Seconded by: Jesse Goossens THAT the Minutes as prepared for the Boundary Adjustment Advisory Committee meeting of October 19th, 2021, be adopted. Carried 4.Disclosures of Pecuniary Interest and the General Nature Thereof There were no disclosures of pecuniary interest declared. Resolution #3 Moved by: Cedric Tomico Seconded by: Samantha Hamilton THAT the committee move into closed session at 7:37 a.m. to consider a proposed or pending Acquisition or disposition of land by the municipality or local board. Carried 5. Presentations 5.1 Eric Gilbert, Senior Planner, Oxford County Re: Oxford Planning Briefing Memo dealt with in Closed Session. 6. Round Table The Committee resumed open session at 8:11 a.m. 6.Next Meeting December 21, 2021 at 7:30 a.m. – This meeting has been rescheduled to January 18th 2021. It is requested that Eric Gilbert’s team provide information on Industrial land expansion. 7.Adjournment Resolution #4 Moved by: Jesse Goossens Seconded by: Andrew Burns Page 3 of 3 THAT the November 16, 2021 Boundary Adjustment Advisory Committee meeting be adjourned at 8:15 a.m. Carried STAFF BRIEFING NOTE COMMUNITY PLANNING OFFICE Overview of Process and Land Use Planning Considerations Related to Municipal Boundary Adjustments for Settlement Expansion Purposes October, 2021 Background/Purpose The purpose of this memo is to provide a brief overview of the land use planning process and related considerations associated with a municipal boundary adjustment for the purposes of an urban settlement expansion (e.g. for development purposes) in the County of Oxford. This memo does not address the various other issues and considerations that may be part of the boundary adjustment discussion process, such as impacts on municipal assessment, compensation and service agreements etc. Overview of the Settlement Expansion Process a) Municipal Act Framework Locally initiated municipal boundary adjustments are subject to the relevant provisions of Part V of the Municipal Act, 2001 that address a negotiated settlement between municipalities and the approval of the annexation by the Minister of Municipal Affairs and Housing. There is no Provincial requirement to justify the proposed location, configuration and/or extent of the lands to be incorporated into the corporate boundary of an urban municipality as part of the boundary adjustment process under the Municipal Act. However, such matters are still essential to consider if the annexed lands are intended for settlement expansion purposes, as the permitted use of such lands is determined by their Official Plan designation and zoning, not by the location of the corporate boundary. Development of any annexed lands for non-agricultural (e.g. settlement) purposes would require an Official Plan amendment to re-designate the lands from ‘agricultural reserve’ to ‘settlement’. Such amendments must be consistent with the policy requirements of the 2020 Provincial Policy Statement and the County Official Plan, both of which require justification of need and location for any settlement expansion. These types of Official Plan amendments tend to be closely monitored by the Province to ensure they have been justified in accordance with Provincial policy. Therefore, if the intent of a municipal boundary adjustment/annexation is to incorporate lands for settlement expansion/development purposes, planning staff generally advise that the relevant land use planning considerations be considered (at least preliminarily) as part of the boundary adjustment process. This will help to ensure that municipalities involved in the boundary adjustment process have a general understanding of whether the location and extent of any lands to be annexed can be reasonably justified for re-designation to ‘settlement’, before the boundary adjustment is finalized. Planning staff are available to assist in this regard by providing planning related information and advice, including the preparation of preliminary land use screening mapping for any proposed annexation areas, where requested. b) Land Use Planning Considerations - Provincial Policy The Planning Act requires that all municipal land use planning decisions be ‘consistent with’ the Provincial Policy Statement (PPS). The current 2020 Provincial Policy Statement contains a range of policies that apply to proposed settlement expansions including, but not limited to: i) 25 Year Planning Horizon Section 1.1.2 of the PPS directs that sufficient land shall be made available to accommodate an appropriate range and mix of land uses to meet projected land needs for a time horizon of up to 25 years. The projected growth is to be accommodated through intensification and re-development and, if necessary, designated growth areas. However, the PPS does not limit planning for infrastructure and public service facilities or long term protection of employment areas beyond a 25 year planning horizon, provided that no lands are designated for growth beyond the 25 year planning horizon. Further, the PPS does not prevent municipalities from undertaking planning (e.g. secondary planning and servicing strategies) for a longer time frame or larger area, provided that no lands are designated for growth beyond the 25 year planning horizon. Given the considerable lead time often required to complete municipal boundary adjustments and the secondary planning required to expand a settlement area designation and to provide the level of certainty necessary to undertake the comprehensive, longer term planning required to ensure the development of complete communities and associated infrastructure and public services, municipalities may wish to consider looking beyond the 25 year planning period for the purposes of adjusting their corporate boundaries. The designation of any additional growth lands in accordance with such longer term plan could then be phased-in (e.g. through Official Plan amendment) as required to ensure a consistent 25 year supply of land is maintained. ii) Coordination Section 1.2 of the PPS indicates that the Upper Tier Municipality (in consultation with Area Municipalities) is responsible for matters such as:  Identifying and allocating population, housing and employment projections to the Area Municipalities;  Identifying where growth or development will be directed;  Identifying targets for intensification and redevelopment; and  Providing policy direction to the Area Municipalities on matters that cross municipal boundaries. In Oxford, this PPS requirement is largely addressed through Official Plan policy and the County Growth Forecasts and Land Needs Study (e.g. Phase 1 Comprehensive Review, 2020), which is updated in consultation with the Area Municipalities approximately every 5 years. iii) Providing for Appropriate Range and Mix of Housing Section 1.4.1 of the PPS requires that planning authorities maintain at all times the ability to accommodate projected residential growth for a minimum of 15 years through residential intensification and redevelopment and, if necessary, lands which are designated and available for development. Further, a minimum 3 year supply of residential units in draft approved or registered plans and/or on lands suitably zoned to facilitate residential intensification is to be maintained together with adequate servicing capacity. iv) Settlement Expansions Section 1.1.3.8 and of the PPS indicates that the designation of lands for settlement purposes can only occur through a ‘comprehensive review’. A comprehensive review is defined by the PPS as an Official Plan review initiated or adopted by a planning authority, which is based on a review of population and employment projections and reflects allocations by an upper tier municipality and which demonstrates that:  Physical constraints to accommodating growth within the existing settlement boundary have been considered and that sufficient opportunities for growth are not available through intensification, redevelopment and existing designated growth areas to accommodate projected needs over the 25 year planning horizon;  Infrastructure and public services which are planned or available are suitable for the development and financially viable over their life cycle and that planning for infrastructure and public services is integrated with planning for growth;  Alternative directions for growth or development have been evaluated and it has been determined how best to accommodate growth while protecting provincial interests. For example, impact on natural resources (e.g. woodlands, wetlands, water, agriculture land/operations, minerals and petroleum, cultural heritage and archeological resources) and protecting public health and safety by avoiding natural and/or human made hazards);  There are no reasonable alternatives that avoid prime agricultural lands or are on lower priority agricultural lands, the proposed expansion complies with the minimum distance separation formula, and impacts on agricultural operations which are adjacent or close to the settlement area are mitigated to the extent feasible; and  Cross jurisdictional issues have been considered. The recently completed County of Oxford Phase 1 Comprehensive Review study (Hemson, March 2020) provides the current basis for addressing the PPS comprehensive review requirements related to population and employment forecasts and allocations and associated land need. Further, the estimated land need for each Area Municipality is generally updated by the County planning office on an annual basis. With respect to the comprehensive review requirements related to the evaluation of alternative directions for growth, following is an overview of some of the key land use planning considerations that must typically be reviewed and addressed in Oxford:  Prime Agricultural Lands – Virtually all lands located outside of designated settlements in Oxford are considered to be prime agricultural land. Therefore, assessment of agricultural impacts is typically a key consideration when evaluating the most appropriate direction for any proposed settlement expansion. Such an assessment typically involves, but is not necessarily limited to, consideration of soil capability, size of parcels, degree of land fragmentation, prevalence of existing non-agricultural uses, size and type of livestock facilities, level of investment in farm infrastructure, and impacts on the broader agricultural system (e.g. support services, agricultural related industries etc.).  Minimum Distance Separation Formulae (MDS) – MDS is a land use planning tool that determines a recommended separation distance between a livestock barn and/or manure storage facility and a potentially sensitive land use (i.e. a settlement area or other non- agricultural use). The objective is to prevent land use conflicts and minimize nuisance complaints related to odour. Given the size and number of livestock operations in the County, most settlement expansion proposals tend to be impacted, at least to some extent, by the presence of existing livestock operations/facilities. The required MDS setbacks from such facilities may limit the use of lands for settlement expansion purposes in certain locations. The application of MDS is optional for a livestock operations are located within a designated settlement area in an Official Plan. In Oxford, MDS is not typically applied to livestock operations that have been incorporated into a designated settlement area through settlement expansion. However, it is important to note that the setback requirements from livestock operations located outside of a proposed settlement expansion area can often significantly limit which lands within a proposed expansion area can be designated for settlement purposes (e.g. as settlement expansions are required to comply with MDS). These potential MDS impacts can result from livestock facilities located as far as 1.5 km beyond the limits of a proposed settlement.  Limestone and Sand and Gravel Resources – The PPS states that, in areas adjacent to or within known deposits of mineral aggregate resources, development and activities which would preclude or hinder new aggregate operations or access to the resource (e.g. settlement expansions) shall only be permitted if the resource extraction would not be feasible, the proposed land use serves a greater long-term public interest and if issues of public health, public safety and environmental impact are addressed. For this reason, it is typically difficult to justify including lands containing such resources in a proposed settlement expansion area.  Natural Features and Areas – Open watercourses are generally considered to be potential fish habitat and any associated valleyland/floodplain areas are identified as both significant environmental features and natural hazard areas. Most wetlands and larger wooded areas are also considered to be significant natural heritage features. Development and site alteration are not generally permitted within such features and any proposed development on any adjacent lands is generally required to undertake an environmental impact study to demonstrate that there will be no negative impact on such features or their ecological functions. As such, although lands occupied by and immediately adjacent to such features are often located within proposed areas of settlement expansion, they are not generally included in the determination of the developable land area.  Natural and Man-Made Hazards – Development is not generally permitted on lands subject to natural (e.g. flooding, erosion, unstable soils etc.) and/or man-made (e.g. contaminated sites, oils and gas wells etc.) hazards. As such, although such lands are often located within proposed areas of settlement expansion, they are generally not included in the determination of the developable land area.  Wellhead Protection Areas – Lands located within a Wellhead Protection Areas may be subject to certain restrictions on uses/activities. For instance, certain activities prescribed under the Clean Water Act are considered to be significant drinking water threats in these areas and, as such, may be prohibited, restricted or otherwise regulated by the policies in an approved Source Protection Plan. Although the vast majority of activities can only be a significant threat within a WHPA-A (e.g. 100 m around the well), Dense Non-Aqueous Phase Liquids (DNAPLS), which may be used in certain industrial type processes/operations, can be significant threats in WHPAs A to C. As such, the WHPAs may be a consideration in determining the most appropriate location for future employment lands.  Efficient Use of Infrastructure and Public Service Facilities – The PPS requires that any infrastructure (roads, transit, water and wastewater, storm drainage, utilities etc.) and public service facilities (e.g. libraries, emergency services, recreation facilities etc.) are suitable for the proposed development and financially viable over their life cycle. Provincial Highway crossings, environmental features, topography, location and capacity of existing services, and type, extent and timing of development are just some of the considerations that may affect the cost and/or feasibility of servicing a potential annexation area. These considerations are typically addressed, at least at a functional level, through the Servicing Strategy that is part of the Comprehensive Review/Secondary Planning exercise required to consider any proposed settlement expansion. However, in the case of infrastructure, any Environmental Assessment requirements will also need to be considered. Any specific questions with respect to planning for Water and Wastewater Servicing infrastructure should be directed to County Public Works. c) Official Plan Policies and Zoning The lands located outside of existing settlement areas in the County are designated primarily as ‘Agricultural Reserve’ in the County Official Plan. Therefore, if any such lands were to be annexed, an Official Plan Amendment would be required to change the land use designation from ‘Agricultural Reserve’ to ‘Settlement’, before any of the lands could be used for settlement purposes. Such an amendment would need to be consistent with the relevant policies of the PPS and Official Plan. The Official Plan policies require the municipality to undertake a secondary planning study and a servicing strategy prior to the re-designation of any annexed lands for settlement purposes. The primary purpose of these studies is to justify the extent and location/direction of the proposed settlement expansion and to identify appropriate land use designations, urban design standards, major road alignments, public service and infrastructure locations and requirements, pedestrian and transit routes, development phasing, how natural resources (e.g. environmental features and aggregates) are to be protected and environmental hazards avoided etc. If more than one area is being proposed for annexation, it is possible that each area could be studied separately, particularly if they are intended for different purposes (e.g. employment vs. residential). Normally, the County and Area Municipality would oversee the preparation of such studies, with qualified consultants retained to assist staff in addressing the complex technical issues. The studies would result in recommendations for appropriate land use designations, and provide directions on which servicing approaches best suit the potential future development of the annexed lands. Following completion of the secondary planning and servicing studies, an amendment to the Official Plan would generally be initiated by the Area Municipality/County to implement the findings and recommendations of the studies. However, in some circumstances (e.g. where the lands are in one ownership and intended primarily for residential development or a single use) the County and Area Municipality may potentially allow a development proponent to prepare and submit the required studies and planning applications for Council’s review and approval. In Oxford, the majority of the land surrounding most existing settlements is zoned for agricultural purposes. Therefore, following the adoption of any Official Plan amendment to establish policies and land use designations for any settlement expansion on such lands, the Area Municipality within which they are contained would need to adopt zoning to accommodate and regulate the intended type and forms of urban development. Post-annexation, two (2) approaches are commonly used to establish new zoning: i) In annexed areas that have not been re-designated for settlement purposes (e.g. remain designated for agriculture), or that are within a settlement designation for which new comprehensive zoning has not yet been established, lands may be rezoned on a site- specific or case-by-case basis in accordance with the applicable Official Plan designation; or, ii) In the case of annexed lands that have been re-designated for settlement purposes, the Area Municipality can pre-zone all of or parts of such lands in anticipation of intended growth. It should be noted that the Zoning By-law provisions of the Area Municipality from which the lands were annexed will generally continue to apply until such time as the municipality that annexed the lands has amended their comprehensive zoning by-law to incorporate said lands. Questions? As a starting point, any questions regarding the information contained in this memo should be directed to the County planner assigned to the Area Municipality(ies) involved and they can then consult with and/or involve other County staff (i.e. PW, policy planners, GIS etc.) as may be necessary to respond. 1 / 2 BRIEFING NOTE Tillsonburg Residential Land Supply Update Updated November 12, 2021 Overview The following information is provided in response to the Town’s recent request for updated growth related information. This information is based on some quick updates to the Town’s land inventory estimates and some growth sensitivity analysis (i.e. based on recent building permit trends) undertaken by planning staff. Hopefully, it will assist with some general discussion of the Town’s potential longer term growth land needs, but should by no means be considered a formal land needs update. Just to be clear, the forecasted growth contained in the Oxford Population, Household and Employment Forecasts and Land Needs study, Hemson 2020 remains the approved growth forecast basis for planning purposes until such time as that study is formally updated (Note: the next planned update to the growth forecasts is currently intended to be initiated in 2023, once all the required data from the 2021 Census has been released). However, the land supply information in the Hemson study is updated by CPO staff on an annual basis (i.e. based on year end building permit data and development approvals), so that information is kept as current as possible. Residential Growth The forecasted residential growth in the Hemson, 2020 study for the current 25 year planning period (2021 to 2046) is 1,990 residential units. In comparison, a quick review of the Town’s building permit data for the 3 year period (2018-2021) indicates that the number of dwelling starts during that period appears to have been considerably higher (i.e. roughly double) the forecasted annual housing growth rate over that period. Although the number of single/semi-detached units was somewhat higher than forecasted, the variation appears to have been primarily driven by a much higher than expected number of townhouse and apartment units being constructed over that period. Based on 3rd quarter building permit data, it appears this trend is continuing into 2021. It is noted that this trend is similar to what is being experienced in a number of the Area Municipalities in the County, however, it currently appears to have been most pronounced in Tillsonburg. Residential Land Supply Based on the actual lot/unit counts for vacant lots in known developments (i.e. submitted, draft approved and registered plans of subdivision, site plans), together with the estimated number of units that could be accommodated on the remaining designated residential lands not yet under development (i.e. based on an average blended density of 22 units per net ha, as per Hemson, 2020), it is estimated that Town’s remaining land supply could currently accommodate approximately 3,235 residential units (note: this is actually up from the estimated 3,112 units of supply in the Hemson study due to the increase in density and gross to net factors). It is important to understand that the 22 units/ha density assumption in Hemson was based on a much lower ratio of the total residential growth being comprised of townhouses and apartment units (e.g. 2 / 2 30%) With the Town’s recent trend toward higher density housing types (i.e. townhouses and apartments), even recent low density residential developments have been closer to 30 units per ha, and that is not even accounting for the development densities of medium and high density residential (i.e. apartments). Therefore, the current average blended density for the Town is likely now considerably higher than the 22 units/ha assumed in the Hemson study (i.e. in excess of 30 units per ha). So, if recent trend in increased building permits for residential units were to be taken into consideration as part of any growth land need update, the average development density assumption would also need to be updated to account for the trend toward higher density units. That would mean the Town’s estimated unit yield for the same developable land area would increase accordingly (i.e. as more units could be expected to be accommodated per ha). For instance, if a fairly conservative blended residential density (i.e. accounting for LD, MD and HD development) assumption of 30 units/ha were now to be used for the purposes of estimating unit yield (i.e. in place of the current 22 units/ha) for lands that are not yet subject to development, it is estimated that the Town’s remaining residential land supply could accommodate approximately 3,750 additional dwelling units. To compare this to demand, even if the Town’s residential growth were to be double the current forecasted growth for the 25 year planning period (i.e. 3,800 units vs. 1,900 units), it would appear that the Town’s current land supply could still accommodate almost all of that growth. That said, planning staff will continue to monitor the Town’s supply and growth trends in preparation for the next formal update to the growth forecasts in 2023. Prepared by: Paul Michiels, Manager of Planning Policy Circulated to: Town of Tillsonburg Boundary Adjustment Committee 25.6 ha12.7 ha11.2 ha 8.7 ha 7.6 ha 28.2 ha 7.9 ha 5.3 ha 2.7 ha 4.4 ha 2.7 ha 1.3ha 0.92 ha 0.59 ha COVEREDPORTICOGGGGGGSITE PLANSCALE 1:500SOUTH RIDGE PUBLIC SCHOOLSOUTH RIDGE ROADTULIP DRIVETRILLIUM DRIVEQUARTER TOWN LINE SIMPLY 360CONDOMINIUMSEXISTINGCONDOMINIUMSLANGRELLAVENUESOUTHRIDGE PARKEXISTING RESIDENTIALEXISTING RESIDENTIALEXISTING RESIDENTIALEXISTING RESIDENTIALEXISTING RESIDENTIALEXISTING RESIDENTIALEXISTING RESIDENTIALNORTH LEGSOUTH LEGWEST LEG EAST LEG EASTENTRANCE1LIST OF DRAWINGSDESCRIPTIONDWG1.2.360 WEST LANDSPART X, XXR-XXXX2563557 ONTARIO INC.361 QUARTER TOWN LINETOWN OF TILLSONBURG6.7.4.5.3.8.9.10.11. ~ ------------ MUN#164188 ~ MUN#3 MUN#i 12 T CORNER OF' C£SSJON, 11 1 4-5. a li 2 I ~ 1'----,1-;;3e:72=s-~--11 ~ ~ 10 ~~Jl~.-.l--~--,,37'.62~7-1-1-+-; 1-z w (.) Vl w a; () a ~ Cl 0 0 5 MUN#J06 \ ~\ \89 3 Oo""o+---i OPEN SPACE MuNR104 MUN#100 P.lN. 74 :; 78 ::l - MUN#98 M0N#94 I RESIDENTIAL QQ019 0 --------- MUN#92 MUNf90 MUN#68 62 1 .. 911 .15. t1 --------~---- ------ RESIDENTIAL .MiJN#80 31 29 28 27 MUN#72 MUN#70 MUN#68 RESIDENTIAL 32 34 35 36 BLOCK 202 · 0_:922Ha fr_/i~· MUN#66 ! 44 32.736 MUNl64 '"' 0 ~1 9\ o:> . MUN#60 MUNH2 MUN#4 MUN!f6 PARK PL MUN#1 MUN#3 MUN#5 INTUITIONAL MUNif280 1-------·----- -----·----c----t -----1-- RESIDENTltL . MUN#2 ' L~-- S\!t1Jelll10 ltllll coodillona. if 11.11'1• -~In our leltef dated !lb~ 2 "' · _, 20 ;t,1 , this draft pl~ pprollfld under section 51 ol tl'le Planning AP· B s.o. lil!!l. as. amended, th~ £-1-1. GFl!J 0(1 ffirnw)t -.20 '~ Director . Community Planmng county of Oxford MUN#4 WOODLAND CRESCENT. ~ WOODSIDE DRIVE " ~ JAMES AVENUE ~t--:'~~M~ES~A"'11~U~E-,-~L,_-t"°-~t w 8 ~ ~ g ~~ ~ NORTI-1 STREET WEST .(COUNiY ROAD 20) "< No 1 2 KEY PLAN DRAFT PLAN OF SUBDIVISION PART OF LOT 8 CONCESSION 11 ALL OF PIN 00025-0875 GEOGRAPHIC TOWNSHIP OF DEREHAM MUNICIPAL/TY OF THE TOWN OF TILLSONBURG COUNTY OF OXFORD OWNER'S AUTHORIZATION WE HERESY SUBMIT THIS DRAFT PLAN OF SUBDIVISION WE HAVE THE AUTHORITY TO BIND THE CORPORATION, SOUTHSIDE CONSTRUCTION MANAGEMENT LIMITED NTS SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT THE BOUNDARIES OF THE LAND TD BE SUBDIVIDED, AS SHOWN DN THIS PLAN, AND THEIR RELATIONSHIP TO THE ADJACENT LANDS ARE ACCURATELY AND CORRECTLY SHOWN. KlM~4~ .. KIM HUSTED SURVEYING LTD. REQUIREMENTS UNDER SECTION 51 ( 17) OF THE PLANNING ACT A: /lS SHOWN ON PLAN 8: AS SHOWN ON PLAN C: /lS SHOWN ON KEY PLAN D: LOW AND MEDIUM DENSITY RESIDENTIAL E: /lS SHOWN ON PLAN F: /lS SHOWN ON PLAN G: />$ SHOWN ON PLAN H:. MUNICIPAL WATER I: SAND LOAM J: AS SHOWN ON PLAN K: FULL SERVICES w l>S SHOWN ON PLAN LAND USE SCHEDULE LAND USE· LOW DENSITY RESIDENTIAL LOTS 1 THROUGH 103 MEDIUM DENSITY RESIDENTIAL BLOCKS 200 & 201 STORMWATE'.R MANAGEMENT FACILITY BLOCK 202 & 203 PARKLAND BLOCKS 204 ROAD WIDENING BLOCK 205 & 206 G T 0 (STREETS A, B, C & D) TOTAL AREA AREA IN. HECTARES 6.837 2.074 0.827 0.991 0.120 2.595 13.444 % 50.9% 15.4% 6.1% 7.4% 0.9% 19.3% 100.0% London Office 41 Adelaide St. JN., Unit 71 (519) 672-8310 . development ~ • • l'arl&Offlce enQlQ~~!JtlJJ 31 Mechanlp St., Unit 1101 (519) 442-1441 CONSULTING CIVIL ENGINEERS . REVISIONS DATE DRAFT PLAN APPLICATION SEPT. 01/20 REVISED MEDIUM DENSITY BLOCK 200 OCT. 28/20 1--t------' WESTWINDS SOUTHSIDE CONSTRUCTION MANAGEMENT LIMITED PROJECT No. DEL20-005 SCALE -SHEEf No. 1w~ DP Pl.Ml f!LE No. ~L-~~;__~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..;__~~~~~~~~~~~~~-.,._,.-~~~~~~~~~~~-.,.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-'-~~~~..,.-~~~~..._~~~~~~~~--' J LOT 1 z oo u <( _J 0 <( er: l.J.. REGISTERED PLAN QJ 1062 EXISTING RESID~TI~ I I 0 !RI -COUNTY PL.~ZA 11 L1)l1--~ 2 ,, •' ,, REGIS TE Rl:D I • - ! I LOT I I Mu n ~<9 I GRASS vEqo cc.~smucno" J zz 00 iii (/) (/) (/) LL.I LL.I (.) (.) zz 00 LL.I (.) (.) (.) 5 0::: LL.I Ul I-1-o o _J ...J 1 PLAI~ 1033 SITE I KEY PLAN SCA L E 1: 10,000 LOT IJcn f56 • 0 ~\ GEC GRAPHIC I MuotOe I I I .________. :·· ''" PART 1l • 41R PART 2 1766 I 5 I I......_"'·· •. ----\ I~-~ - EJ l·STINGl_RESIDE TIAL ~1 NSHI L::_JJ ~ P·JSOIB LE FlJ IU~C '°' ·---.. ·' CONCESSION OF °' i "' ' 10 DER EH AM FUTURE DEVELOPMENT -iv m PAR'~,, 41R -5045 ::T:_--r · ---~,,-;m-:::: ... ___ --- ... , "" f . ----··--··· ---- ·"' EXI RESIDENTIAL .. . .. ---------.------ N 0 R0 T:H s + RE ET 0 •••••••••••••••• 0 COU'NTY ROAD 20 0 0 .. / 0 . - • 1 L2~ 11.91m 4.5"- 15.0"- / f---+---rl:.t"'' ~ ,, --J ·~-- DRAFT PLAN SUBDIVISION OF ALL OF LOT 72A PART OF LOT 72 JUDGE'S PLAN REGISTERED PLAN No. 500 TOWN OF TILLSONBURG COUNTY OF OXFORD SCALE 1: 750 0 10 25 50 METRE 100 NOTE: OR IGINAL CONTOURS SHOWN FROM 20XX CJDL SURVEY AS • N 78 ' 35' 15" E • ·--.. , _______ _ \ "-"'• AREA SUMMARY OESCRIPTION AREA (ha) LOTS 1-7,12,13,16-16,22-43,48, I SINGLE DETACHED RESIDENTIAL 3.99 52-71,70-77,66-96 1 (76 LOTS) LOTS 6,9,10,11,14,15, 19-21, I TOWNHOME RESIDENTIAL 2 .24 44-47,49,50,69, 78, 79,80,87 (40 LOTS) DEDICATED STREETS STREET 1A1, 'B'. 'c', ·o· 2.69 BLOCK 99 I FUlURE RESIDENTIAL 0.06 ' BLOCKS 100, 101 PARK 0.28 BLOCK 102 SWM 0.43 ' BLOCKS 103-105 ROAD WIDENING 0 .13 ! BLOCKS 106-108 ' RESERVES 0 .01 I TOTAL I 9.83 I I ----------__ , ___ " ---------------• . -----.... ----- ,_~"="~•+--tl:-22m " 70~ 71 / 18 . .53m ' ---. : ,' 72 14.Jlm 0 ---------244.5. __ / "' c.n INFORMATION REQUIRED UNDER SECTION 51(17) OF THE PLANNING ACT RSO 1990 (A) ON PLAN (B) ON PLAN (C) ON PLAN (D) LOTS 1-7,12,13,16-18,22-43,48,52-71,70-77,88-98 -SINGLE DETACHE ,D RESIDENTIAL LOTS 8,9,10,11,14,15, 19-21,44-47,49,50,69,78,79,80,87 -SEMI-DETACHED RESIDENTI AL DED I CATED STREETS -STREET 'A', STREET 'B', STREET 'C', STREET 'D', / BLOCK 99 -FUT. RESIDENTIAL BLOCKS 100, 101 -PARK BLOCK 102 -SWM BLOCKS 103-105 -ROAD WIDENING BLOCKS 106-108 -RESERVES (E) NORTH -EXIST ING RESIDENTIAL, FUTURE DEVELOPMENT WEST -SERVICE COMMERCIAL ZONE EAST -FUTURE DEVELOPMENT, PASSIVE USE OPEN SPACE ZONE SOUTH -EXISTING RESIDENT IAL, PASSIVE USE OPEN SPACE ZONE (F) ON PLAN (G) ON PLAN (H) TOWN WATER AVAILABLE (I) SAND (J) ON PLAN (K) STORM SEWERS, SANITARY SEWERS, TELEPHONE, GAS, T. V.CABLE (L) TOWN OF TILLSONBURG OFFICIAL PLAN AND ZONING BY-LAWS DISTANCES SHOWN ON THIS PLAN ARE IN METRES AND CAN BE CONVERTED TO FEET BY DIVIDING BY 0.3048. • ".?-1<1 ··S. '-i: ~OCK 108 73 12.82m ((Jl<lfl£:!Qq~ 74 IJ' ------ " -QO /f-'.) w w er: OWNER'S CERTIFICATE • ·· .. -L , ?.!!Om --J , . ....,J ----------------------7.00m __ . --· -·· -----· -----· .. 1-~--------,---1 z ,•' .,,,f 1 41-6192 ( ·--7 (/) ,:; v <( ~ 0 w a::: ' w I- (/) : : (.'.) .' W / .fr'. t-:c·" <D L..l z . <( __J 0.. MIKE HUTCHINSON PROPERTIES INC., THE REGISTERED OWNER OF THE LANDS TO BE SUBDIVIDED, HEREBY AUTHORIZE CYRIL J. DEMEYERE LIMITEQ fT O SUBMIT THIS DRAFT PLAN OF SUBDIVISION FOR APPROVAL. (2 "\ DATE ~._..f\M I CHAEL RICHARD HUTCH INSON, PRESIDENT \ \ ~ MIKE HUTCHINSON PROPERTIES INC. ~ p... SURVEYOR'S CERTIFICATE~\_, V I HEREBY CERTIF·Y THAT THE BOUNDARIES OF THE LANDS TO BE SUBDIVIDED AND THE IR RELATIONSHIP TO TO THE ADJACENT LANDS ARE ACCURATELY AND CORRECTLY SHOWN ON THIS PLAN. DATE CJDL Consulting Engineers 0626 KIM HUSTED, ONTARIO LAND SURVEYOR Cyril J. Demeyere Limited P.O. Box 460, 261 Broadway Tillsonburg, Ontario . N4G 4H8 Tel: 519-688-1000 866-302-9886 Fax: 519-842-3235 cjdl@cjdleng.com 28 JUNE 2019 " ' ' ~ r- 0 0 z UI -I ::u m m -I .. T EJo· ;::o (Tl (/) G'f<NARY -c STREET N r.::i ~ tJ . • ' ,._ z -ct>< i: EJ -m ~ _, z 3 ~-----0 , ;::o D -~4' 0 - (Tl z · 0 B LOCK 12 P..,.L--i -.. 34. 72m BLOCK 12~ i 33. 72m [_j 4/(.- • • 0 .... ---~ ... ... _ .. ~- 2 rn r w ~ • 0 -' • N • w ' 33.00m t 25 24 I I I I I FAPTI 2 I '"·-r- ·155 .---- • I 1 ~ • ~ I • ' • ~ I 33.00m 23 I I I Zp • • ~ . -~L;--J-1 " ~ ~ " FUTURE RESIDENTI A L s: )> N ::O 0 -t 3 - AJ z O C/) ::;;: -t ::0 m m -t 20 19 -. -'"33.00m u ~ 0 0 3 N 12" 17' o.J"" E c -42.!162 A • 42.832 R • 110.000 90 4-'R 33.00m 18 33.00m °""' LAND USE SCHED U LE DESCRIPTION PHASE 1 Single Family Residential Townhome Residential Park I Walkways Stormwaler Management 3m Road Widening Rood• Phase 1 Total LOTS/BLKS . UNITS 1-2 . 4-17 , 19-41 , 49-50, 54 , 56--59 , 61-63 , 67, 74-78 , 83-85, 91 -93 , 96 , 102, 109-116 3 , 18, 42-48 , 51-53 , 55, 60 , 64-66, 68-73 , 79-82, 86-90, 94-95 , 97-101 , 103-108 117-119, 123 120 12 1-122 lARK STREET, MARTIN STREET , KEBA CRESCENT , MALLARD STREET , BRAUN AVENUE , CANARY STRE ET 71 202 273 / FUTURE RESIDEN TIAL CANARY STREET 20m ROW 89 88 87 86 60 AREA (ha) 3.95 5.27 2.11 1.08 0.03 3.81 1625 ·4 ~KEBA CRESCENT 411.? • • • 20m ROW ~'-L·4a ' ' 0 33.00m § 33.0dm 33.00m 32.00m ., cf' "' -"""' ' m N ~ ' m -w m 1 7m ' ~ l,i p -~--~o 15 76 ~n 78 ' m • ' KEBA CRE ~C~N1 j r--- ' I I I I I 8 -- ,, " 'L ·a· ---- I I I " zo I r:~ ..: I 9 I 20m ROW 8 7 8 22 .33m J ' ' ' ' I ,.:;:'~ ' ' ' ' . ' .__: '-w - ' ,, INFORMATION REQUIRED UNDER SECTION 51(17) OF THE PLANNING ACT RSO 1990 (A)ON PLAN (B )ON PLAN (C)ON PLAN (D) LOTS 1-2, 4-17 , 19-41, 49-50 , 54 , 56-59 , 61-63 , 67, 74-78 , 83-85, 91-93 , 96, 102, 109-116, SINGLE FAMILY RESIDENTIAL, LOTS 3, 18, 42-48, 51-53, 55, 60, 64-66, 68-73 , 79-82 , 66-90 , 94-95, 97-101 , 103-108, TOWNHOME RESIDENTIAL DEDICATED STREETS-LARK STREET, MARTIN STREET, KEBA CRESCENT, MALLARD STREET, BRAUN AVENUE, CANARY STREET BLOCKS 117-119,123-PARK, WALKWAY, BLOCK 120-SWM AREA BLOCKS 121-122-ROAD WIDENING, (E) NORTH -FUTURE RESIDENTIAL, FUTURE PARK/ WOODLAND WEST -EXISTING RESIDENTIAL, PARK EAST -FUTURE SWM, FUTURE RESIDENTlAL SOUTH -EXISTING RESIDENTIAL , (F) ON PLAN (G)ON PLAN (H) TOWN WATER AVAILABLE (I) SAND (J) ON PLAN (K) STORM SEWERS, SANITARY SEWERS, TELEPHONE, GAS , T .V .CABLE (l) TOWN OF TILLSONBURG OFFICIAL PLAN AND ZONING BY-lAWS DISTANCES SHOWN ON TH IS PLAN ARE IN METRES AND CAN BE CONVERTED TO FEET BY 4 f fPNIDING !!)' 0 .3048. 5045 DRAFT PLAN OF SUBDIVISION PART OF LOT 5 CONCESSION 10 GEOGRAPHIC TOWNSHIP OF DEREHAM TOWN OF TILLSONBURG COUNTY OF OXFORD OWNER'S CERTIFICATE LINDPROP CORP ., THE REGISTERED OWNER OF THE LANDS TO BE SUBDIVIDED, HEREBY AUTHORIZE CYRIL J . DEMEYERE LIMITED TO SUBMIT THIS DRAFT PLAN OF SUBD IVISION FOR APPROVAL . 2021-07-07 --------------oArE ·---- OWNER'S CERTIFICATE N Tr 54' 54• E N 79"" 01 ' JS• E DETAIL "A" ;, ., /' ~' --EREHAM-a 32.00m 33.82m MALLARD AVENUE 20m ROW ' 34.84m .,, c ~ ;::o (Tl ;::o (Tl (/) 0 (Tl z -l )> r -_,.,,.. _:;;.;__-"! --""'"'"I _/ - ~0 ------. _,.._ L '-· NOT TO SCALE LOT 5 CONCESSION • PART 2 4/R -ii 10049 I ~~ 41R - oz N 711"35' I ~ E ..... ~v i r ~N711"ll'll5"E rn-13' 4tj ___/' }.11 I PART 1 I PART 2 41R -1166 I I 10 5045 154.190 PERFORMANCE COMMUNITIES REALTY INC ., THE REGISTERED OWNER OF THE LANDS TO BE SUBDIVIDED, HEREBY AUTHORIZE CYRIL J. DEMEYERE LIMITED TO SUBM IT THIS DRAFT PLAN OF SUBDIVISION FOR APPROVAL . 2021--07-08 DATE PERFORMANCE COMMUNITIES REALTY INC . SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT THE BOUNDARIES OF THE LANDS TO BE SUBDIVIDED ANO THEIR RELATIONSHIP TO TO THE ADJACENT LANDS ARE ACCURATELY AND CORRECTL V SHOWN ON THIS PLAN . 2021-07-08 DATE GI:. _,PAPHIC' I TOWNSHIP OF DEREHAM DETAIL "B" NOT TO SCALE 5 CONCESSION PART PART 1 41R 2 ~ 17.670 N 7lr 2tf 4tr E _._,,._ ... _,,,._._,_ ... _·w-~11:... I ; I I GF GRAPH 1C ~OWNSl-llP I 10 "i045 SCALE 1:1000 0 1D 25 SD METRE 1DO I I NOTE : ORIGINAL CO NTOURS SHOWN FROM 2021 CJDL SURVEY ~ER HAM CJDL Consulting EnglnE&rs 21001 ADJAC NT LAND~..__ OWNED BY ~PPLICANT (LINDPR b . Cyril J. Demeyere Limited P.O. Box 460, 26 1 Broadway Tillsonburg, Ontario. N4G 4H8 Tel: 519-688-1000 866·302 ·9886 Fax: 519-842-3235 cjdl@cjdleng.com 7 JULY 2021 No. 20 KEY PL AN SCALE 1:10,000 SIT KEY PLAN SCALE 1:10,000 ' - "' 0 ~ 0 w ~ '::i ::::> CJ ' • ' ' , ' J , -LL -u ct z <( -0 <( z () , ' l , ' ' , , , . , , ' ' ' ' ! " ' ' ' . ' j ! ' ' ' ' ' , ' ; / ' J ' ' ' , ' ./ J ' ' J :,/ .,'I •'*" ' ' I , ' J ' Lor 1 , ' ' " 4/R '• ~ ~ j l ' ~ 4 " <o -., I Q: ' ' ' ' ' ' ' ' i ' E EX. RE"S IDENTIAL LOT 4 E X. RESIDENTIAL 29 22 ·-~ OF" N 119• 11' 1:5" £ PART J 4 ?R -9357 10 4 lR -9357 .. ~· 2 E l'l 1 ' ' ' ' ' ' ' -1 ').---: ~--,-,, ~ : E " ~ ~ l. • • r ~ • . , ._ r ~ -. , ' r ' ' . ' ' ' ' ' ' ' ' -, ' 0 i .. , \ ----...... i ', ""I' • ........... '\ E \ 0 • , ' ' ' ' ... , '\. . ' ' ' ,--.---'~,,~,:~,,~'~,,......l r:~:i-r~~ I \ -----".. ",..,. I -/ E ----------, ' ' ' PART J 41R -5239 0 41 s2v z 0 P pr? . N 7!' t 4'_r,:_'(_ ~ ' : a::i :z : <( ! 0:: ll-~~.J_~~~--.~-j ~ ~~--...&..!.c_---==~===-~~~~~~·~~ E ' t-~..-..-t1 I~ i '~ E ~ ~ \ li-~~...-"lii>m.1-~:--~ : >I ' M E ' ' ' ' • ---1--1" I 1 .... :' I -: u I ~ .. • r L ~I •• : ~·1 ' . 33 34 24 26 l;j i-~~..l<.1-'Jl!::-f-ti--1 ~ m EX . RESIDENTIAL /__<! /<t D£R£HAM .t I • ' ~ l ~ ~ • • rff i • NORTH STREET EAST-COUNTY RD. 20 a 0 "' 0 ~ 0 w ~ '::i ::::> CJ "' 0 z :5 0 w ~ '::i ::::> CJ <i >--z w 0 en w "' >< w <i "' z w 0 "' w "' >< w DRAFT PLAN OF SUBDIVISION PART OF LOT4 CONCESSION 10 GEOGRAPHIC TOWNSHIP OF DEREHAM TOWN OF TILLSONBURG COUNTY OF OXFORD INFORMATION REQUIRED UNDE R SECTION S1(17) OF THE PLANNING ACT RSO 1990 (A) ON PLAN (B ) ON PLA N (C) ON PLAN (D) LOTS 1-49 -SINGLE DETACHED RESIDENTIAL, DEDICATED STREETS -STREET 'A', BLOCK SO -CO MMERCIAL BLOCK BLOCK S1 -SWM BLOCKS S2-SS -ROAD WI DENI NG (E) NORTH -EXISTING RESIDENTIAL, FUTURE DEVELOPMENT, WEST -TRAIL, CULTIV ATED LANDS EAST -EXISTING RESIDENTIAL SOUTH -EXISTING RESIDENTIAL , COMMERCIAL (F) ON PL AN (G ) ON PLAN (H) TOWN WATER AVAILABLE (I) SAND (J) ON PLAN (K ) STOR M SE WER S, SANI TARY SEWERS, TELEPHONE, GAS , T.V.CABLE (L) TOWN OF TILLSONBURG OFFICIAL PLAN AND ZONING BY-LAWS DISTANCES SHO WN ON THIS PLAN ARE IN METRE S AND CAN BE CONVERTED TO FEET BY DIVIDING BY 0.3048. SCALE 1: 750 0 10 2S so METRE I I 100 NOTE : ORIGINAL CONTOURS SHOWN FR OM 20XX CJDL SURVEY AREA SUMMARY DESCRIPTION LOTS 1-49 SINGLE DETACHED RESIDENTIAL (49 LOTS) DEDICATED STREETS STREET 'A' BLOCK 50 C0Mt.4ERCIA L BLOCK BLOCK S1 SWt.4 BLOCKS S2-SS ROAD v.IDENING TOTAL OWNER'S CERTIEICAIE AREA (ha) 2.93 0.90 0.11 0.44 0.08 4.46 GEO RGE AMBRUS, THE REGISTERED OWNER OF THE LAND S TO BE SUBDIVIDED, HEREBY AUTHORIZE CYR IL J. DEMEYERE LJMITED TO SUBMIT THIS DRAFT PLAN OF SUBDIVISION FOR APPROVAL OWNER'S CERTIFICATE CLARA J AMBRUS, THE REGISTERED OWNER OF THE LA ND S TO BE SUBDIVIDED, HER EBY AUTHORIZE CYRIL J. DEMEYERE LJ MITED TO SUBMIT TH IS DRAFT PLAN OF SUBDIVISION FOR APPROV AL ::(Lwi,;:. t I i.oz...t DATE SURVEYOR'S CERTIFICATE CLARA J AMBRUS I HEREBY CERTIFY THAT THE BOUNDARIES OF THE LANDS TO BE SUBDIVIDED AND THE IR RELA TION SHIP TO TO THE ADJACENT LANDS ARE ACCUR ATELY AND CORRECTLY SHOWN ON THIS PLAN. 31 MA Y 2021 DATE CJDL Consulting Engineers 19083 KI M HU Cyril J. Demeyere Limited P.O. Box 460, 261 Broadway Tlllsonburg , Ontario. N4G 4H8 Tel: 519-688 -1000 866-302-9886 Fax: 519-842-3235 cjd lCP cjdleng.rom 31 MA Y 2021 I 'l c --1 c :;:o rri AJ rri (J) 0 rrl z -I J> r-- I ~-,-1 I -I ~./};ZJI_ ... 1 P_R_o_P_o_s_E __ o_s_1D_E_w_A_L_K_L_o_c_A_T_1o_N~ I .· .I -- ' 1 ! . .>~ 31 S -(M) N 78" -~·1\ c.J.(;" . ' .-, 1 2 i8,23 12.20 :;:, :L_ ' '!:;, --,, -1-·") c ,,-, -0 "' ..,-"' ·,'> . .. " 'f, \{ II \ I LANO _USE__2" ABL~--r----------r·-·-·····-····-··--·-····· 1~~~~SED DIVISONS I PROPOSED LAND USE I AREA ! DENSITY ' II LOTS 1 TO 53 _.=_-r'.'.'GcE ~-~~'<CU lMELLINC5_0~2,---+_~37-~; (58;-~ueo) i~~ 1.UNl~S~c~: BLOCKS 1 TO 5 (35 LNJTS) lslREET FROMTJNC '0\VNHOUS£S (RM) D 93 ha-· (2.3~~~~:~~;--1·-~~-22 UMITS/ocrfl J--8-LO::v~~------t:-Nl-£:1~~-l BLO_-;-_.~_-_--_·-_· ·-O 32 lo (5.4%) I BLOCK 7 ------.1 WAl.KWAX Q.•J084 ~o ! ---·---t---------1 ----·---l I 1..38 ho j ;.-~~-~~~~~~~~'--~~~~~~~~~~·-~'---·---........ ~=~--'-~~~~~~-! I' TOTAL AREA 4.98 ha. IL_ ____ . ------------' ' ROADWAYS ROADWAYS 3 \ " 4 8 . ' 12.20 I\ i \\ v, o'.: -z. ,, )>: -<" .. -..._ .fll ····· z c fTl I 5 -·1'~ 6 g / g: ., ,:_;_• ·-r ;-·· .,,.. I . \ \ \ \ I i :, ; -. ·7 .. 8 12.20 1\GRICULTURAL >' -. i ' ' I ···· .... i. l [O 10.~··11 q jg I 1 2 If 1 ;3 .. ~. 1 4 I ..... ······ .. I !2 20 12.'.<0 t2.2'J --1. < .. 12.20 12.:w 12.20 ... : /•; B :STREET. D c •' J \ .. c' ·2_!':·rn "'"'01. i 44 12.64 20rr1 .. • / RFSIDENTIAL m 0 / 42 43 17.-00 : -<, :::CJ rn tr ~ N 0 ;Z 17 76 17 18 19 20 3'..50 ---------------··- 22 .. 31.50 ~ -24 Si.50 .• J! .50 -------------- .26 1 ·'-----3_:_.so ____ _ 27 ! --,-31-50 ' 1··.J----··-·---··-·.·-------·- 1· ~ 28 i \il I ' ~ 2.9 ! .... "---'""""'"''"'' ----..11 1 6t BLOCK 5 BLOCK 6 .fv1 U ~,JICIPAL BLOCK 0.3231 ho > .> • . iJ --n d < <. --,, L:+ r; l ' -·· z l'l i.' ' @, i I I I I I ! 'i ' j I ~to ht COl!dlliOll8, If q, Mlt blll lfl 0111 letter dated faj %± .:t ± , 20 \ fl , lhls draft plan Is approved under -- :S~~:~1~~011~r !~:Cd A!<l fi "ti ,20.l.iL.. 2~:t? KEY PLAN N.T.S. DRJl,FT PLAN OF SUBDIVISION OF PART OF LOT24 LAND REGISTRAR'S COMPILED PLAN 1653 MUNICIPALITY OF THE TOWN OF TILLSONBURG COUNTY OF OXFORD SURVEYOR'S CERT!flC_ATE I HEREBY CERTIFY THAT THE LANDS TO BE SUBOIV10£0 ANO THEIR RELATIONSHIP TO THE ADJACENT LANDS ARE ACCURATELY AND CORRECTLY SHOWN. D.~TED: l .r -. L' CON.!$_ENT I HEREBY CONSENT TO THE FILING OF THIS PLAN IN DRAFT FORM FOR APPROVAL DATED: ,;_:, :~·· ''i >· .'....L-:.L·-'·-· :.... _____ _::,;...:;.;:.:.__· ___________ . __ · . ./ '. :·, .'''.,, OWNER: _:_.,_:,,:.:_.02~.:.:_ ________________ , _____ _ SECTION 51 ( 17} PLANtjlNG ACT R.S.O. 1990 (o) SHOWN ON DRAWINGS. (b) SHOWN ON DRAWINGS. (c) SHOt.VN OM DRAWINGS. ( d) LOTS 1 TO 53 TO BE USED FOR SINGLE DETACHED DWELLINGS BLOCKS 1 TO 5 TO BE USED FOR STREET FRONTING TOWNHOUSES BLOCX 6 TO BE USED FOR A PARK ( e) SHOWN ON DRAWINGS ' (f) SHOWN ON DRAWINGS . (g) SHOWN ON DRAWINGS. (h) A MUNICIPAL WATER SUPPLY WILL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE REQUIREMENTS OF THE COUNTY OF OXFORD. (1) SOIL POROSl"IY -HIGH (j) SHOWN ON DRAWING. (k) MUNICIPAL SERVICES INCLUDING WATER SUPPLY, SANITARY SEWERS. STORM SEWERS. CURB AND GUTTER, PAVED ROADS, STREET LIGHTING AND SIDEWALKS WILL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE REQUIREMENTS OF THE COUN1Y OF OXFORD. (I) NO RESTRICTIVE COVENANTS IN EXCESS OF THE EXISTING ZONING AND BUILDING BY-LAWS ARE PROPOSED. DA.1"!! R~Vl$i0t.1 . -"~------·---~··--- SUBDIVISUlN DRAFT PLAN - TOWN OF TllLLSONBURG OAAWN ev: DES~GNEE} JSV: CHl'!CKi!il SY: SCALE DCB JilV MJ .. 1;750 DATE G. DOUGLAS VALLEE LIMITED l\IOV 14, 2017 2 TALBOT STREET NORTH SIMCOE, ONTARIO N3Y 3W4 I DRAWiNGNO. {519) 426-6270 17-0!IS-1:.I' I 15 16 18 19 20 21 22 23 24 25 26 17 38 43 42 41 40 39 44 48 53 54 37 36 35 34 33 32 31 30 29 28 27 9 10 11 12 13 1476543218 49 50 51 52 474645 TOWN OF TILLSONBURG SCALE 500 100 File Number: Drawn By: Planner: Scale: CAD: see scale bar Drawing Number: METRES DRAWN / REVISED First Draft OX 01 C6 Concept Plan _R4 NJ 5 JAN 2021 DRAFT FOR DISCUSSION PURPOSES ONLY Revision to Street C11 JAN 2021 27 JAN 2021 Revision to Layout 09 MAR 2021 Revision to BLOCK 9 PARTS 4,5 & 6 LAND REGISTARS' COMPLIED PLAN 1653 TOWN OF TILLSONBURG COUNTY OF OXFORD Total Site Area: DEVELOPMENT STATISTICS: DRAFT PLAN 5.029 ha LEGEND Subject Lands Single Detached Dwelling 54 units 79 unitsTotal Street Fronting Townhomes (7.5 x 18.6m)25 units POTTERS GATE PHASE 4 Proposed Sidewalk KEY PLAN N.T.S. PROPOSED OF SUBDIVISION OF SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT THE BOUNDARIES OF THE LANDS TO BE SUBDIVIDED AND THEIR RELATIONSHIP TO TO THE ADJACENT LANDS ARE ACCURATELY AND CORRECTLY SHOWN ON THIS PLAN. KIM HUSTED,ONTARIO LAND SURVEYOR OWNER'S CERTIFICATE I HEREBY CONSENT TO THE FILING OF THIS PLAN IN DRAFT FORM FOR APPROVAL. DATE OXNARD POTTERS GATE INC. LAND USE TABLE PROPOSED DIVISIONS PROPOSED LAND USE AREA DENSITY LOT 1 to 54 SINGLE DETACHED DWELLINGS (R2) BLOCK 1 to 6 (25 UNITS)STREET FRONTING TOWNHOUSES(R3) 2.504 ha (6.189 acre) 0.688 ha (1.702 acre) 8.72 UNITS/acre 14.68 UNITS/acre BLOCK 7 ROADWAYS ROADWAYS WALKWAY 0.0094 ha 1.470 ha (3.632 acre) TOTAL SITE AREA:5.029 ha BLOCK 8 0.210 ha EXISTING SINGLE DETACHED DWELLING ADDITIONAL INFORMATION UNDER SECTION 51(17) OF THE PLANNING ACT INFORMATION REQUIRED BY CLAUSES a, b, c, e, f, g AND j SHOWN ON DRAFT AND KEY PLANS. (h) A MUNICIPAL WATER SUPPLY WILL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE REQUIREMENT OF THE COUNTY OF OXFORD. (i) SOILS ARE GENERALLY COMPRISED SAND AND SANDY SILT , SOIL POROSITY - HIGH (k) MUNICIPAL SERVICES INCLUDING WATER SUPPLY, SANITARY SEWERS, STORM SEWERS, CURB AND GUTTER, PAVED ROADS, STREET LIGHTING AND SIDEWALKS WILL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE REQUIREMENTS OF THE COUNTY OF OXFORD. (l) NO RESTRICTIVE COVENANTS IN EXCESS OF THE EXISTING ZONING AND BUILDING BY-LAWS ARE PROPOSED. DATE I:\ACAD Projects\2017\1705\01-Model\1705_Concept Plan.dwg, 27/02/2017 2:01:55 PM, CJDLPC22,1:1ANDREWSCROSSING CONCEPT PLAN TOWN OF TILLSONBURG Cyril J. Demeyere Limited P.O. Box 460, 261 Broadway Tillsonburg, Ontario. N4G 4H8 Tel: 519-688-1000 866-302-9886 Fax: 519-842-3235 cjdl@cjdleng.com PHASE 1 PHASE 2 PHASE 1PHASE 2 PHASE 1 PHASE 2REIDSTREET GR A ND VIEW D R IVE DENRICHAVE.JANE S TREET QUARTERTOWNLINED ER EH AM DR IVE GR A ND VIEW D R IVE ES S EL TINE D R IVE DENRI CHAVENUESANDERSDENRI CHAVE. DEREHAM DRIVE W ILSON AVENUE DENRICHAVE.A R N O L D S T R E E T S A N D E R S C R E S C E N T DEREHAM DRIVE WILSO N AVENUEQUARTERTOWNLINEWILSONAVENUE D E R E H A M D R I V E CRESCENTLOWRIECRESCENTARNOLDSTREETVICTORIAWAY New Dwelling Units by Type YEAR # NEW SFD # NEW TOWNHOMES 2021 167 171 2020 110 129 2019 90 40 2018 82 35 2017 84 7