Loading...
220517 Boundary Adjustment Committee AgendaPage 1 of 2 The Corporation of the Town of Tillsonburg Boundary Adjustment Advisory Committee May 17, 2022 7:30 a.m. Hybrid AGENDA 1.Call to Order 2.Adoption of Agenda Proposed Resolution #1 Moved by: Seconded by: THAT the Agenda as prepared for the Boundary Adjustment Advisory Committee meeting of May 17, 2022 be adopted. 3.Minutes of the Previous Meeting (ATTACHED) Proposed Resolution #2 Moved by: Seconded by: THAT the Minutes as prepared for the Boundary Adjustment Advisory Committee meeting of April 19, 2022 be adopted. 4.Disclosures of Pecuniary Interest and the General Nature Thereof 5.General Business and Reports 5.1 Oxford County Planning Memo – Updated Residential Inventory and Forecast (ATTACHED) 5.2 Tillsonburg Land Inventory (ATTACHED) 5.3 Tillsonburg Boundary Lands – Constraint Mapping (ATTACHED ) Page 2 of 2 6.Round Table 7.Next Meeting June 21, 2022 8.Adjournment Proposed Resolution #3 Moved by: Seconded by: THAT the May 17, 2022 Boundary Adjustment Advisory Committee meeting be adjourned at _____ a.m. 5.4 Boundary Service Review (ATTACHED) Page 1 of 3 The Corporation of the Town of Tillsonburg Boundary Adjustment Advisory Committee Meeting April 19, 2022 7:30 a.m. Electronic MINUTES Present: Dave Bares (Chair), Mayor Stephen Molnar, Andrew Burns, Samantha Hamilton, Absent with Regrets: Cedric Tomico Also Present: Cephas Panschow, Development Commissioner Kennedy Atkinson, Acting Executive Assistant Kyle Pratt, Chief Administrative Officer 1.Call to Order The Chair called this meeting to order at 7:34 a.m. 2.Adoption of Agenda Resolution #1 Moved by: Samantha Hamilton Seconded by: Andrew Burns THAT the Agenda as prepared for the Economic Development Advisory Committee meeting of April 12, 2022, be adopted. CARRIED 3.Minutes of the Previous Meeting Page 2 of 3 Resolution #2 Moved by: Andrew Burns Seconded by: Samantha Hamilton THAT the minutes prepared for the Boundary Adjustment Advisory Committee meeting of March 8, 2022 be adopted. CARRIED 4.Disclosures of Pecuniary Interest and the General Nature Thereof No Disclosures of Pecuniary Interest and the General Nature Thereof 5.General Business and Reports 5.1 Update on Tillsonburg Land (Residential/Industrial) Inventory. Update and Constraint Mapping Development Commissioner, Cephas Panschow provided an update on the land inventory. Mapping of land that can be developed and brought into the boundary will be provided. 5.2 Closed Session Resolution #3 Moved by: Andrew Burns Seconded by: Samantha Hamilton THAT Correspondence be received and staff be requested to respond appropriately. AND THAT staff be requested to approach MHBC planning consultants as potential directional resources for future boundary adjustments. CARRIED 6.Round Table No items for Round Table 7.Next Meeting Page 3 of 3 May 17, 2022 8. Adjournment Resolution #4 Moved by: Samantha Hamilton Seconded by: Andrew Burns THAT the April 12, 2022 Economic Development Advisory Committee meeting be adjourned at 8:04 A.M. CARRIED 1 / 4 Tillsonburg Residential Supply Update (Year end 2021) As of year end 2021, it is estimated that the Town’s total remaining residential land supply was approximately 2,910 – 2,975 residential lot/units, with a more detailed breakdown as follows: o 1,458-1,523 unbuilt lots/units remaining in proposed/approved development (i.e. actual counts from proposed/approved development on lands shown as dark red/brown on the attached map). o 1,450 estimated lots/units that could be accommodated on the remaining approximately 66 ha net hectares of undeveloped residential lands within the Town (i.e. calculated for all of the lands shown as blue on the attached map). These estimates are currently based on the methodology contained in the Hemson 2020 study, which is generally as follows:  Applying a gross to net adjustment factor to the gross developable land area (i.e. the total parcel size with undevelopable areas such as flood plains and protected natural features removed) of each parcel to estimate the net developable land area (i.e. using Hemson 2020 assumptions - 120.5 gross developable ha x 0.55 gross to net factor = 66.3 net hectares);  Multiplying the estimated net developable land area of each parcel by the estimated average net residential density (i.e. 22 units per net hectare in the Hemson study) for new development to calculate the total unit potential for each parcel and then totaling to determine the total lot/unit potential on such lands. As noted in previous correspondence, the net development density and net to gross conversion factor assumptions applied to the remaining unbuilt lands can have a considerable impact on the land supply estimates, which is why a relatively conservative density of 22 units/net ha and gross to net conversion factor of 55% was used in the Hemson, 2020 study (i.e. to ensure the net residential land area and associated residential land supply estimates were not over estimated). Based on the above supply estimates and current growth forecasts (Hemson 2020), the Town’s existing residential land supply would be sufficient to accommodate the forecasted residential growth for the current 25 year planning period (2022-2047). That said, it is noted that formal updates to the County and Area Municipal growth forecasts and land needs study and related assumptions and conclusions are currently intended to be initiated in early 2023. These updates will take into consideration the 2021 Census information and various changes in development and growth trends that may have occurred since the last study was completed (i.e. recent strong residential building activity in Tillsonburg and elsewhere in the County). Therefore, it is currently expected that there could be substantial changes to some of the growth forecasts for the 25 year planning period as part of those formal updates. However, it should also be noted that the average net residential density and gross to net ratios BRIEFING NOTE 2 / 4 for more recent residential development in the Town also appears to have increased (i.e. closer to 30 units/net ha and 60+ percent, respectively). So, if the land supply estimates for the remaining undeveloped lands in the Town were updated to reflect more recent development, that could also substantially increase the Town’s estimated residential unit potential/supply. The attached mapping also shows the Town’s remaining industrial employment land supply as of year end 2021, which is approximately 96 gross developable ha. That said, lands currently under application would remove approx. 13 gross developable ha from the current industrial land inventory (will be formally removed once required building permits issues). As previously communicated, it appears that the Town will likely require some additional industrial employment land to accommodate the current forecasted employment growth for the 25 year planning period (based on Hemson, 2020). This land need would increase once construction of buildings has been initiated on the above noted 13 ha. Further, similar to the above comments on residential growth, the employment forecasts and associated land need for the Town will be further reviewed as part of the County’s broader growth forecasts updates planned for early 2023, which could also change the Town’s employment land need. Prepared by: Paul Michiels, Manager of Planning Policy Circulated to: Town of Tillsonburg Boundary Adjustment Committee Further information: Paul Michiels, pmichiels@oxfordcounty.ca, 519 539 0015 ext 3209 Date: May 12, 2022 25.6 28.22 7.9212.6811.23 8.74 7.58 5.3 4.4 2.75 2.76 1.32 0.92 00.59 0.53 0 450 900 1,35 0 1,80 0225Metres ² Tillsonburg Land Supply inventory - 2021 Map Created by CPOMay 2022 Legend Environmental and DevelopmentConstriants Overlay Tillsonburg Supply M apping Supply data current to end of2021 Built Lands Underutilized Lands Vacant Commercial/InstitutionalLands Vacant Industrial Lands Industrial Lands UnderApplication Vacant Residential Lands Vacant Residential Lands UnderApplication Settlement Boundary ^_^_^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ OSTRANDER RD DEREHAM LINEKESWICK RD ZENDA LINEPRESSEY RD NORTH S T NEW RD HAWKINS RD POTTERS RD CONCE SSION ST OTTERVILLE RD VIENNA RDWHPA - B WHPA - C WHPA - CWHPA - C Legend ^_Barn Locations for MDS Consideration Municipal Boundary Serviced Village Boundaries Limestone Resource Area (From OP) Quarry Area (LU Desig. From OP) Woodlands Wetlands - Non-Provincially Significant Wetlands - Provincially Significant Life Science / Provincial; Life Science / Regional Wellhead Protection Area Vulnerabililty Score 2 4 6 8 10 Sand & Gravel Resources UTRCA Generic Reg. Limit ² 0 550 1,100 1,650 2,200275Metres Tillsonburg BoundaryAssessment Map Date: May 2022Map Created By: CPO Text Map 1 A2 A2 OS A2-14 RR A1 A2-30 A1 A2-24 A1 A1A2-31 I RR AB I A1 RR A1 A1 OS A1 I A1 A2-15 REC A1 A1 A1 RE A1 RR A1 RE I A1 RR RE I RE A1-C1 A1 RR A1 RR A1 A1 AB-4 A1-6 MG A1 RE A1 A1 A1 RR RE I-3 A1 RE A1RE RE A1-4 RR RR RR RE RE RE RE REC RE RE RE RE I RE RE RR RR V RE MR RE RE RE RE RE RR RR RE RR-14 I I RE RE RR RE V RE RE RR RE RE RR RE RE RE RE RR-9 RR HC-5 RE RE REMR RE V RR RE RE RE RR RE HC RE RERE RE RE RERR-2 RE AB-8 RE-5 RE RE HC RR-31 RE RE HCRR-30 RE RE RR-13 RE RE REDEREHAM LINEOSTRANDER RD KESWICK RD ZENDA LINEPRESSEY RD NORTH ST HAWKINS RD MALL RD CONCESSION STCRANBERRY LINETOWN LINE RD NEWELL RD Legend Municipal Boundary Zoning Serviced Village Boundaries Soils - Canada Land Inventory (CLI) -Prime Agriculture Class 1 Class 2 Class 3 ² 0 550 1,100 1,650 2,200275Metres Tillsonburg BoundaryAssessment Map Date: May 2022Map Created By: CPO Text Map 2 Boundary Servicing Review The engineering department was asked to complete a desk top study to assess the current infrastructure at the limits of the Town of Tillsonburg boundary along with an assessment of infrastructure exceeding Town limits. This report will discuss the findings to date. Looking at the Western, Northern and Eastern limits all would have access to watermain extensions if supported by County water supply. Storm and sanitary sewer networks are different depending on each location. Western Limit – 251 ha The western limits have not had any sanitary studies completed to date. In 2018, when the Town completed the extension of Concession Street West, Oxford County did not support over sizing the sanitary sewer towards town limits. Storm sewers would need to be supported by extension of sewers from future developments west of Baldwin place. Given the layout of the land, a transportation network would be relatively easy and could support a truck route reaching to Highway 3. Access to future underground infrastructure and transportation routes provides a promising area for new development. Northern Limit – 410 ha Similar to the western limit, the northern limit would need to be supported by future development for the extension of storm sewers. Based on past studies by the County and Town in 2005, the current sanitary infrastructure supports an area up to Keswick Road. The northern limit would have access to Highway 19, Keswick and Cranberry road as collector and arterial roads allowing for an effective road network. Access to 2 future underground infrastructure and transportation routes provides a promising area for new development. Eastern Limit – 260 ha The eastern limits of Tillsonburg currently have the most access to sanitary and storm sewers with existing sewer stubs at Moncie and Pearl Street however the southern section would need to cross the ball diamonds to reach a sanitary sewer stub. Even though the sanitary sewer design included 260ha the natural land features are a significant obstacle when looking at gravity sewers. In terms of traffic routes the majority of the eastern limit would be accessed though existing subdivisions and creation of an arterial or collector road would be difficult. 3 When looking at total area of land, access to underground infrastructure and transportation routes, Engineering would recommended further discussion in regards to the northern limits. The eastern limit does have the ability to service a smaller area quickly but if looking for a large area the northern appears to have more potential. Please note given the lack of previous studies and that the Town does not have full access to the County sanitary sewer information a deeper study would be required to review the western limits. Further the Engineering department would need to evaluate the topography to confirm if gravity sewers are sufficient or forcemains required and a geotechnical investigation to gather soil samples and water elevations on all sides. Supporting drawings are below: Figure 1 – Northern limit of sanitary 2005 study area Figure 2 – Study limit of Eastern limits 4 Figure 1 Northern limit of sanitary 2005 study area 5 Figure 2 Study limit of Eastern limits W:\DRAFTING\WORK\2005\0517_ANNANDALE_REV 15 December 2021.dwg, 2021-12-15 9:51:44 AM, CJDLPC36